Services / Engineered scopes

    Two service paths.
    One measured start.

    Choose solar engineering or audit-led maintenance. Each path starts with site evidence, establishes a written scope and makes the commercial boundary clear before work begins.

    § 01 — Service paths

    Pick the path that matches the site.

    Isometric Moroccan professional building with a rooftop solar array and wall-mounted inverter.
    § SIZINGSite-specific scope

    ReneWave Solar

    One accountable path from evidence to commissioned system.

    Share your site details for a free first review. ReneWave completes the remote Solar Study before sending a written installation quote; the later visit confirms practical installation details.

    § Included

    • Structured intake from bills, planned loads or project documents
    • Paid site-specific Solar Study and architecture
    • Equipment supply and installation to the accepted scope
    • Commissioning, monitoring and operating records
    • Manufacturer warranty and technical support
    Isometric commercial building cutaway with accessible electrical, pumping and ventilation systems.
    § AUDIT + FOLLOW-UPRECOMMENDED

    ReneWcare Max

    Maintenance built from a technical baseline.

    The technical audit establishes the site record and condition grades. ReneWcare Max turns that baseline into preventive work, corrective response and a maintained operating history.

    § Included

    • Full technical audit (Phase 1)
    • Condition grades A–D, system inventory
    • Maintenance scope built from audit findings
    • ReneWcare Max structured follow-up
    • CMMS record and manufacturer warranty support
    § 02 — What is included

    What the engagement actually covers.

    Two engagements, two commitment sets. Below is what ReneWave carries after the signature — and what stays quoted on its own line.

    § ANNUAL MAINTENANCE

    We qualify the site before we maintain it.

    ReneWcare Max is the annual technical maintenance engagement for hotels, riads, guest houses, restaurants, clinics, offices, retail and tertiary buildings. The audit establishes the real condition of the site; coverage is built on that record.

    4h

    Target on qualified critical faults

    24/7

    Requests received

    6

    Technical families covered

    No cap

    On labour for covered equipment

    Before committing to coverage, we establish an initial state. That is what makes maintenance measurable.

    § How the commitment is carried

    ReneWave emblem for the technical audit and entry into maintenance coverage.
    01

    § ENTRY INTO COVERAGE

    Audit, technical upgrade, activation.

    The general technical audit grades the equipment and defines the maintainable perimeter. Critical points are corrected before full coverage opens — in one pass or in phases. You are not required to bring the whole site up to standard on day one: once an agreed minimum is reached and received, maintenance takes effect while the later phases run in parallel.

    ReneWave emblem for manufacturer warranty support.
    02

    § WARRANTY CONCIERGE

    You do not chase manufacturers.

    When a component falls under a manufacturer warranty, ReneWave diagnoses the fault, prepares the claim, handles the exchanges with the brand or its representative and coordinates the return to service once the claim is accepted.

    ReneWave emblem for the maintained technical record and site console.
    03

    § TRACEABILITY

    Everything is measured, everything is visible.

    Every piece of equipment on the site is registered in our maintenance management system. Every intervention is logged with dated before and after photos, and you receive a quarterly equipment condition report. That discipline is what allows decisions based on evidence rather than conjecture.

    § Six technical families

    If the equipment falls within the categories covered by your audit — or joins them after upgrade — it is handled under the terms of the engagement, without a labour cap.

    ReneWave emblem for electrical installations.
    01

    Electrical installations

    Boards, circuits, lighting, protections, earthing.

    ReneWave emblem for plumbing and hot-water systems.
    02

    Plumbing & hot water

    Networks, taps, sanitary fittings, pressure boosting.

    ReneWave emblem for air-conditioning systems.
    03

    Air conditioning

    Splits, multi-splits, VRV/VRF, chillers, fan coils.

    ReneWave emblem for heating systems.
    04

    Heating

    Electric and gas boilers, safeties, ventilation, flues.

    ReneWave emblem for solar hot-water systems.
    05

    Solar hot water

    Thermal collectors, tanks, circulators, antifreeze.

    ReneWave emblem for refrigeration and cold-chain systems.
    06

    Cold chain

    Refrigerators, freezers, cold rooms, display cabinets.

    § Included in the annual engagement

    • Preventive visits at a cadence set by criticality

      Planned inspections, functional tests and operating checks — no artificial visits, no under-maintenance.

    • Corrective labour and travel for equipment in scope

      Intervention time on covered equipment is not re-invoiced.

    • Priority triage from P1 critical to P4 planned

      Critical: 4h in working hours, 8h outside. Medium: 24h. Reception open 24/7.

    • CMMS technical history

      The maintenance record of the site — kept even when your staff changes.

    • Manufacturer warranty concierge

      We open and follow the claim with the brand on your behalf.

    • Private monitoring console and annual review

      You see the state of the site without asking for a report.

    § Invoiced separately

    • Spare parts and consumables, sourced by ReneWave and owned by you once delivered and paid
    • Technical upgrade work, quoted before it starts
    • Equipment outside the audited perimeter until it is brought in
    • Energy-efficiency audits — insulation, heat recovery, consumption reduction, cogeneration

    Heritage sites

    Zellige, carved plaster, worked cedar, tadelakt, bejmat, painted ceilings. Any intervention liable to affect these elements is subject to a joint condition statement and prior written authorisation. Your heritage is not collateral damage.

    Full ReneWcare page

    Summary only — the signed agreement remains the reference.

    § 03 — Process

    How an assessment works.

    Each path starts with your site information. For Solar installations, the remote study supports a written price before the visit.

    ReneWave emblem for structured project evidence and intake.
    01

    Intake

    Structured evidence establishes the question and the quality of the starting data.

    Leaves this stageEvidence set
    ReneWave emblem for preliminary technical direction and planning.
    02

    Direction

    ReneWave returns preliminary direction, missing inputs and an indicative planning range.

    Leaves this stagePlanning range
    ReneWave emblem for system architecture and engineering validation.
    03

    Engineering

    The paid study or audit establishes the validated scope and written assumptions.

    Leaves this stageValidated scope
    ReneWave emblem for carrying the approved scope into on-site work.
    04

    Delivery

    ReneWave carries the approved scope into installation or covered maintenance.

    Leaves this stageWork delivered
    ReneWave emblem for the retained commissioning or maintenance record.
    05

    Record

    Commissioning or maintenance history remains visible after handover.

    Leaves this stageSite record
    Evidence → scope → delivery → recordEach stage leaves something the next stage can verify.
    § 04 — FAQ

    Straight answers.

    The five questions operators ask before the first visit.

    The first exchange and the triage of your documents cost nothing. The paid step is the engineering deliverable itself — the Solar Study or the general technical audit — and its scope and price are confirmed in writing before any work begins.

    It is graded and listed with the corrective work it needs. You are not required to bring the whole site up to standard at once: coverage activates on the perimeter that has been received, and the remaining phases run in parallel on an agreed sequence.

    Yes. The audit exists precisely for that. Any equipment inside the six covered families can enter the perimeter once its condition is established and any corrective work is agreed.

    Requests are received 24/7. Under ReneWcare Max, a qualified critical fault carries a 4h target in working hours and 8h outside them, and a medium-priority fault a 24h target. For solar sites, we qualify remotely first so that a site visit arrives prepared.

    Labour and travel on covered equipment are inside the annual fee. Physical parts, upgrade work and separate studies are not — they are sourced and quoted transparently, so the annual fee never hides a variable cost.
    § 05 — Not sure where to start?

    Send us your bill, quote, or site photos.

    The first review is free. For a full Solar installation, ReneWave studies the project remotely before quoting; the complete study file is released after quote acceptance and deposit.

    Choose intake path
    Start with one site

    Tell us about the site. We come measure.

    Every ReneWave engagement begins with a written assessment. Reach out and we will scope the visit.

    ReneWave markRENEWAVE

    Energy systems, held to standard.