Two calculated PV operating points
Two MPPTs track two separately calculated groups using four inputs arranged 2+2.
Each tracker publishes 26 A operating and 39 A short-circuit-current limits.

Exact reference · SUN-20K-SG01HP3-EU-AM2
A 20 kW three-phase hybrid inverter integrating two PV trackers, one high-voltage lithium battery interface, selected-load output and one configurable generator port. The battery, BMS, metering, protection and generator remain separate.
Service capacity, continuous current, phase allocation and surge behavior still require calculation.
The complete array must satisfy power, voltage, current and clipping checks.
Four connectors remain grouped behind two trackers and are not four independent channels.
The exact lithium battery, BMS, conductors and protection must support the intended operating current.
Selected loads and each phase must be designed deliberately.
Do not select this inverter from 20 kW or high-voltage storage alone. Confirm string allocation, battery voltage and current, BMS protocol, phase loading, surge demand, AC service and GEN-port assignment.
Pricing confirmed by quote
The written quote confirms the exact reference, required accessories, compatibility, delivery and commercial terms.
Availability confirmed in your written quote
01 · Product role
The SUN-20K-SG01HP3-EU-AM2 receives four designed PV inputs grouped behind two MPPTs, converts solar or battery DC into controlled three-phase AC and coordinates a separately protected load output. Utility, generator and storage operation depend on separate equipment, protection and commissioned settings.
Relevant applications
Why ReneWave may shortlist it
Built-in capabilities
Two MPPTs track two separately calculated groups using four inputs arranged 2+2.
Each tracker publishes 26 A operating and 39 A short-circuit-current limits.

Available PV or battery power is converted into controlled three-phase AC.
Rated output is 20,000 W with 22,000 VA maximum apparent power.

One input connects a separately validated 160–700 V lithium battery architecture.
The published maximum charge and discharge current is 50 A.

Grid, protected-load and configurable GEN interfaces coordinate valid operating states.
The GEN port is assigned one commissioned function at a time.
Inside the energy system
Solar conversion inside the inverter. Storage, external protection and configured load circuits remain separate.
PV passes through two MPPTs and the inverter to serve selected protected three-phase loads.
The GEN port is configured for one role at a time. This diagram shows generator input only in Generator support mode.
Three-phase solar and high-voltage storage within one coordinated hybrid architecture.
The Deye SUN-20K-SG01HP3-EU-AM2 combines two photovoltaic trackers, three-phase conversion, one high-voltage lithium battery interface and a protected-load output. Four PV connectors remain grouped behind two MPPTs. The complete system still requires a validated battery and BMS, metering, external protection and commissioned settings.
Functional boundary
The GEN port is configurable and performs one role at a time. A 160–700 V storage range does not establish universal battery compatibility, and unbalanced output does not remove the need to calculate phase loads, conductors and protection.
02 · Specifications
40,000 W access · 32,000 W input
2 MPPTs · 4 inputs arranged 2+2
150–850 V MPPT · 1,000 V maximum · 180 V startup
26 A operating · 39 A Isc per MPPT
20,000 W · 22,000 VA
30.4/29 A · 33.4/31.9 A at 380/400 V
97.6% maximum · 97.0% European weighted
1.5× rated power for 10 seconds
1 lithium input · 160–700 V
50 A maximum
80 A continuous
Configurable GEN port · one role at a time
408 × 638 × 237 mm excluding connectors and brackets
30.5 kg
IP65 · intelligent air cooling
Up to 10 units under documented conditions
03 · Confirm before quotation
ReneWave confirms the electrical context, connected equipment, installation conditions and configuration path before the exact reference enters a written quote.

Confirm cold Voc, operating voltage, 26 A operating current, 39 A Isc, module count and exact 2+2 allocation.

Confirm 160–700 V behavior, exact lithium battery, BMS protocol, 50 A current path, usable capacity, per-phase demand and surge.

Confirm service capacity, 80 A pass-through path, phase allocation, selected circuits, conductors, protection, earthing and cooling clearance.

Confirm the single GEN-port role, CT or meter direction, firmware, communications, parallel settings and operating schedule.
04 · Documents & warranty
Documents shown here support selection and handover. The accepted order and exact manufacturer warranty document control.
5 years standard · extension only when ordered
05 · Complete the system
Select relevant companions now. ReneWave still verifies quantities and compatibility before they appear in the written quote.
No additional equipment is published for this reference. Required accessories are confirmed during quotation.
RENEWAVEEnergy systems, held to standard.